logo.jpg (2041 個位元組)About  Company

line1.gif (5608 個位元組)

point1.gif (387 個位元組)Guan Tyan Plant

Yuan Gang ductile iron pipes , fittings and valves are engineered and manufactured to high standards in a 34120-square meters factory complex at Guan Tyan Industrial Park ,Tainan ,Taiwan.
Floor space 34,120 m²
Total power 3100HP (2300KW)
Employees 332 (1999)
Production capacity : Straight Ductile Iron Pipes 45,000 tons/year
Ductile Iron Fittings 2,400  tons/year
Valves 2,000  tons/year

point1.gif (387 個位元組)DI Pipes & Fittings Plant-Qingdao

Due to the fast growing demand both domestically as well as internationally, Yuan Gang lndustrial Co. Ltd. has invested and transferred its know-how and set up a new plant in China.
Established in March 1992, the plant was located in the suburban of Qingdao City. The plant has total area of 274 acres or 182,666 square meters. The plant started the production in May 1995, mainly producing Ductile Iron Pipes(Ø100mm ~ Ø2600mm), Fittings(Ø100mm ~ Ø2600mm), Resilient Valves and Gate Valves(Ø75mm ~ Ø350mm). The plant has been re-named as Qingdao Chenggang Casting Pipe Co., Ltd. ( QCCP) and continue its production with renewed ISO 9001 & product certification.

Production capacity : Straight Ductile Iron Pipes 100,000  tons/year
Ductile Iron Fittings 25,000  tons/year
Valves 3,000  tons/year

Further Yuan Gang Industrial Co. Ltd established new association with Rizhao Zhufu Industry Co., Ltd. as an associated company to provide DI Pipes & Fittings and associated products at a competitive price with efficient service keeping the quality as highest priority.

Production capacity : Straight Ductile Iron Pipes 150,000  tons/year
Ductile Iron Fittings 15,000  tons/year

Our factory Rizhao Zhufu Industry Co., Ltd. has well trained skilled personnel to meet the international demand of Pipes & Fittings to suit the Client’s demand & delivery requirements. The plant is capable of producing DI Pipes & Fittings with a dia. range of 80 mm to 1600 mm.

 

point1.gif (387 個位元組)Company History & Important Events

May  1978 Established the company
May  1979 Completed the factory building,and produced the Ductile Iron Fittings, DN75mm - DN600mm diameter.
Nov. 1979 Produced the Ductile Iron Fittings, DN2000mm-DN2600mm diameter,to meet the demand from the constructions of the Taipei Water Supply Business Office.
Feb. 1980 Produced Sluice Gate Valves,Gates,Fire Hydrants,and valves for the water supply organizations.
Nov. 1981 Received the honor of being Class B excellent water equipment factory from the Water Works Association of the Republic of China (Taiwan).
Oct.  1982 Extened more factory land area & built the valve factory, and increased more machinery and equipment for valve & special fitting production.
Jun.  1983 Started to export the DN100mm-DN800mm ductile iron fittings to Saudi Arabia and opened the International market since then.
Mar. 1984 Had a technical  collaboration agreement with KUBOTA LTD., Japan, on  the development of Butterfly Valves , Sluice Gate Valves,Check Valves,and Air Release Valves,etc.
Feb. 1985 Started the production of DN75mm-DN1000mm Ductile Iron Pipes of centrifugal resin sand shell mold casting.
May 1985 Had been graded as Class A excellent manufacturer by The  Commodity Inspection & Quarantine Bureau of Taiwan.
Aug. 1986 Had been graded as Class A water pipe contractor by the Department  of Reconstruction,Taiwan.
Nov. 1986 Set up the Engineering Department to do the business of water pipeline constructions.
Feb. 1987 Successfully developed the DN1800mm Butterfly Valves and put it into formal production.
Aug. 1988 Extended more factory land area and built new office building .
Jun.  1989 Purchased the 40 tons holding furnace from Swedish ABB Company and started its formal operation.
Jun. 1990 Completed the factory and equipment for producing the extra large size DNl350mm-DN2400mm Ductile Iron Pipes of centrifugal resin sand shell mold casting.
Mar. 1991 Successfully developed  the DN2000mm x 5M Ductile Iron Pipe,and put it into formal production.
Nov. 1991 Received the honor of being Class A excellent water engineering constructor from the Water Works Association of the Republic of China (Taiwan)﹒
Dec. 1991 Successfully developed the large size DN 2000mm, 2200m, 2400mm Butterfly Valves , and put them into formal production.
Mar. 1992 Investment in Qingdao, China for a new D.I Pipes, Fittings and Valves. Pipes ranging from DN 100 - DN 2600mm.
Jul. 1992 Successfully developed the DN75mm-DN300mm resilient valves  which was officially used  by the Taiwan Provincial  Water Supply Corporation and the Taipei Water  Supply  Business Office.
Oct. 1992 Established, promoted and performed the system of computerization .
Mar. 1993 Successfully developed the DN350mm Resilient Valves and  put it into formal production.
Apr. 1993 Successfully developed the DN500mm-DN2400mm Flap Valves ,and put it lnto formal production.
Apr. 1994 Head/Main Office Expansion Completed.
May. 1994 Purchased New Guan Tyan Second Factory.
Jan. 1995 Obtained ISO 9002 Certification.
May. 1995 Set up New Automatic Processing Plant For Small Diameter Pipes Up To 300mm.
June. 1995 Set up a New D.I.P Factory in China Qingdao Northern Steel & Pipes.
Jan. 1997 Set up Additional 8 Ton/Hr Capactity Cupola And 40 Ton Capactity Holding Furnace.
Dec. 1997 Set up an Automatic Sand Blasting Machine For Pipes.
Jul. 1998 Set up an Automatic Bitumen Spraying Machine For Pipes.
Sep. 1998 Set up a large diameter DN 2600mm Hydraulic (Water) Test Machine.
Nov. 1999 Successfully Developed DN 2200mm×5m large diameter ductile iron Pipe, and putinto formal production.
May. 1999 Successfully Developed DN2600mm Butterfly Valves And DN1000mm Gate Valves.
Jul. 1999 Established the Export Department.
Sep. 1999 Successfully Completed BS EN 545 certification under SIRIM Malaysia supervision.
Oct. 1999 Successfully developed the PE external coating on DIP as well as internal PU coating.
Nov. 1999 Obtained ISO 2531 certification for Ductile Iron Pipes and Fitting.
Feb. 2000 Developed S type restrained joint earthquake proof Ductile lron Pipe.
June. 2001 Successfully Completed BS EN 545 And BS 598 Certification under PSB Singapore.
Apr. 2002 Obtained ISO 10804-1:1996(E) for Restrained Jint D.I Pipes.
May. 2004 Establishment of Association with Zibo Zhanggang Iro Pipes Co., Ltd as an associate company of YG.
May 2005 The plant (QNSP) in China has been re-named as Qingdao Chenggang Casting Pipe Co., Ltd. (QCCP) and continue its production with renewed ISO 9001 & product certificate.
May 2007 Establishment  of Association with Rizhao Zhufu Industry Co., Ltd. as an associated company.

point1.gif (387 個位元組)Contracts Carried Over (NT$ 10,000)

point1.gif (387 個位元組)Main Equipment

Department Name  of  Equipment Q'TY(set)
Melting Low Frequency Induction (5 Tons) 3
  Cupola (4 Tons) 2
  Holding Furnace (40 Tons) 1
Castong Shop Sand Mill 4
  Molding Machine 1
  Rolling Tank Type Shot Blasting Machine (1.5 Tons) 1
  Monorail Type Shot Blasting Machine (10 Tons) 1
  Air Compressor (20 HP) 2
  Pattern Making Machine 1
Machining Shop Heavyduty Large Lathe 8
(Fittings) Radial Drilling Machine 1600mm × 1500mm 2
  Powder Coating Machine(Ø75mm ~ Ø2600mm) 1
Centrifugal Centrifugal Casting Machine(Ø75mm ~ Ø2600mm) 4
Casting Shop Centrifugal Sand Lining Machine(Ø75mm ~ Ø2600mm) 4
  Core Drive(Ø75mm ~ Ø2600mm) 1
Machining Shop Heavyduty Large Lathe(Ø3000mm × 6500mm) 8
(Pipes) Special Drilling Machine 2
  Roller Type Shot Blasting Machine(Ø1200mm ~ Ø2600mm) 1
  Deformed Spigot Correction Machine(Ø75mm ~ Ø2600mm) 4
Machining Shop Vertical Boring & Turning(Ø4000mm ~ × 1600mm) 3
(Valves) High Speed Lathe(Ø900mm × 2000mm) 15
  Horizontal Boring & Torning 1
  Radial Drilling Machine(2500mm × 2000mm) 4
  Powder Coating Machine(Ø75mm ~ Ø350mm) 1
Cement Lining Centrifugal Lining Machine(Ø75mm ~ Ø2600mm) 4
Hoist Hoist(50, 20, 15, 10, 5 tons) 49
  Forklift(10, 5, 2 tones) 6
  Shovel Car.(2 tone) 2
Annealing Continuous Annealing Furnace(Ø75mm ~ Ø1200mm) 1
  Vertical Annealing Furnace(Ø1350mm ~ Ø2600m) 1
Pressure Pipes Pressure Tester(Ø75mm ~ Ø2600mm) 4
Testing Shop Valves, Fittings Pressure Tester(Ø75mm ~ Ø2600mm) 2
Inspection Spectrometer Analysis ARL:3460 2
  C.E Meter: MUB-450 1
  Metallographic Microscope(ITC-410) 1
  Rubber Aged Tensile, Hardness, Tester 1
  Universal Testing M/C(30 tons) 1
To meet market requirement, the company in China was re-structured at the end of year 2005 and the Company was re-named as Qingdao Chenggang Casting Pipe Co., Ltd.
After re-structure, more investment is scheduled to make for new and advanced equipments and facilities..

 

GUAN   TYAN  PLANT

NO.  20  GANG-YEH  W.  RD.  IR-JEN  TSUN   GUAN  TYAN  SHIANG
TAINAN  HSIEN  TAIWAN  R.O.C
TEL  :  +886-6-6983228
FAX :  +886-6-6980856

 

EXPORT  DEPARTMENT

NO.  20  GANG-YEH  W.  RD.  IR-JEN  TSUN   GUAN  TYAN  SHIANG
TAINAN  HSIEN  TAIWAN  R.O.C
TEL  :  +886-6-6904980 or +886-6-6983228 ext. 21
FAX :  +886-6-6904981 or +886-6-6980856
E-mail : mina@ygic.com.tw

Best viewed with MicrosoftTM Internet Explorer V4.0+msie.gif (8609 個位元組) under 800x600 mode.

Copyright(C)1999,
Homepage All Rights Reserved by Yuan Gang Industrial Co.,Ltd .
Designed by Yuan Gang  M.I.S. Dept.
.